Customization: | Available |
---|---|
Type: | Semi-Trailer |
Load Capacity: | 40t |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description | Fuel tank trailer | ||
Vehicle Main Dimensions | Dimensions(L x W x H)mm | 10190x2500x3650 | |
Wheel base (mm) | 5700+1310 | ||
Overhang (front/rear) (mm) | -/1680 | ||
Approach/Departure angle(°) | -/18 | ||
Weight in KGS | Curb Weight | 5500 | |
GVW. | 35000 | ||
Max. driving speed(km/h) | 75 | ||
Tank Body | |||
Shape | Mono block cylinder | ||
Material | 5mmcarbonsteel | ||
End plate | 6mmcarbonsteel | ||
Lifting Ladder | Including top walkway and backside steel material | ||
Bottom valve | 2 sets of API pneumatic bottom valve | ||
Discharging valve | 2set 100mm discharging valves | ||
Compartment | 1or 2/3 as custom need | ||
Discharging pipe | 4 rubber hose,2 pc,6m long | ||
Manhole cover | Steel manhole cover,500mm,2sets with 2breather valves | ||
Chassis | |||
Main beams | Special design 1 beam, connected by bolts and nuts with tanker body. Removed from tank body for separate transportation | ||
Axle | 2 axles | ||
FUWA 13Ton | |||
Landing gear | JOST brand two-speed, manual operating, heavy duty landing gear | ||
King pin | JOST brand 2" bolt-in king pin | ||
Suspension | German design heavy duty mechanical suspension | ||
Pneumatic Braking system | WABCO RE 6 relay valve. T30/30+T30 Spring brake chamber | ||
Wheel rim | 10R22.5 11.00R20with one spare tire,9pieces | ||
Painting | Complete chassis sand blasting to clean rust .1cost of anti-corrosive prime.2 coats of final paint | ||
Accessories | One standard tool box |